Preventing Copper Theft on Canadian Construction Sites
Copper theft costs Canadian ICI construction $50–80k per site annually. The physical and procedural controls that actually work — and the ones that don’t.
Copper theft costs Canadian ICI construction $50–80k per site annually. The physical and procedural controls that actually work — and the ones that don’t.